|
Gasification PowerExchange Workshop #13: August 9-11, 2013Gasification Workshop Weekend: APL 5th Anniversary Celebration, AR training, Reports from the field.
Gasification Lecture and Demo: Friday, 4:00-6:00PMAPL 5th Birthday Party: Friday, 7:00-10:00pmHands-on programs: Saturday and Sunday, 10am – 7pmAuthorized Representative info seminar and dinner: Saturday night, 7pm
Workshop Cost: Free for GEK or Power Pallet owners, otherwise $150 for Newbies. AR dinner not included. RSVP and/or pay here: http://www.eventbrite.com/event/6812136283Location: ALL Power Labs, 1010 Murray Street. Berkeley, CAAdditional Info for sign up, travel and accommodations at end of email.
————————————————————————————————————————————-
General Program
Our 5th Anniversary Gasification Workshop Weekend is coming up in a […]
continue reading…
We’ve long wanted to provide a reasonably priced grid-tie solution for the Power Pallet. However sync equipment for small scale systems is scarce, and usually at price points near equal the Power Pallet itself. Today we’re announcing the availability of a fully complete, non-hacked, and equipment certified grid-tie solution for the 20kw Power Pallet for $4,995. This is a solution that will work for nearly all global grid standards, as well as enable off-grid parallel feeding with large gensets already at your facility. We think this tie solution is a game changer for the broad usability of the Power […]
continue reading…
Bear Kaufmann, Jeff Tiedeken and Jim Mason are at University of Minnesota, Morris this week installing the Powertainer and setting it up for its initial runs onsite. This has been a long haul, and we’re very happy to finally have it here and soon begin pumping biomass power back into the grid. A big thank you goes to Lowell Rasmussen, Jim Barbour and Dave Aronson at the UMM for making this project possible, as well as their general dedication to proving small scale biomass energy for midwestern ag applications. As well a huge thank you to APL team member […]
continue reading…
Yoav and I just returned from a trip to Indonesia to help with the set up and operational instruction for 2 Power Pallets there.
They are being integrated into a pilot stage “Village Hub” project. This pilot is located next to a palm sugar factory run by the Masarang Foundation (http://www.masarang.nl/). The factory uses waste geothermal heat from a 35 MW geothermal plant to dry and prepare palm sugar. This sugar is prepared from the sap of the Arenga Palm (http://en.wikipedia.org/wiki/Arenga_pinnata), a species studied by Willie Smits who studied forestry in the Netherlands (and gave a great TED […]
continue reading…
Gasification PowerExchange Workshop #6: GEK Building and 10kw Genset Configuration
Gasification Lecture and Demo: Friday, October 23, 7:30-9:30PM Building and Testing: Saturday and Sundday, October 24-25, 11am – 7pm Location: ALL Power Labs, 1010 Murray Street. Berkeley, CA Contact: jim ^at^ allpowerlabs.org Cost: FREEMore Info: http://www.gekgasifier.com
ALL Power Labs is starting a quarterly series of free gasifier workshop weekends to help bring more people to successful operation of small scale gasifiers. These workshops are open to GEK user/owners, as well as anyone with any other type of gasifier- or just a budding interest in the whole […]
continue reading…
Hello everyone, here’s the latest news from All Power Labs on our work with gasification and biochar. We got some great news coverage, better assembly and first fire instructions, more user reports, and as always more research and testing data. It’s all part of our ongoing mission to put the information and tools in your hands, so you can make it yourself, or make it run even better.
Hope you enjoy, and as always feel free to get in touch with any questions, feedback, or user reports, and of course it’s always good to check in on what’s happening in […]
continue reading…
I’m trying to figure out how to better explain the basics of gasification. This is hard, as many of you know. So I’m trying to relate it to things that are generally known about combustion, then complicating matters from there. I’m trying to figure out the layers to take the newbie through- from most simple, to, well, does it ever end . . . ?
Here’s where I’m at currently: http://www.gekgasifier.com/gasification-basics/how-it-works/
How does this work for people? Anyone have suggestions for making it better?
As most of the mysteries of the universe are somewhere contained in the wider problem/opportunity of […]
continue reading…
Bear Kaufmann finished another run on the GEK test and datalogging rig and posted the results here: http://gekgasifier.pbworks.com/Instrumented-Walnut-Shell-Run-082409. This wiki page has a large collection of graphs and other data assemblies from the run. Bear is very clever. Someday he’ll get a Phd in all this. In the interim, we get to ponder his bi-weekly posting of dissertation worthy test runs and data visualizations. Thank you Bear.
The main issue he was/is trying to resolve in this test is how to measure tar. The usual “simplified tar testing method” with the greyscale seems very open to mixing the tar and […]
continue reading…
Put a gasifier in your Baja beach cabana. Or in your back-to-school backpack. Yes, it’s the first ever (and maybe annual) APL “End of Summer / Back to School 10% Off Sale” on all things Biomass Thermal Conversion.
The rules are simple. Buy anything between now and the end of August and take 10% off our already too low purchase prices (shipping stays the same). This can be just a cyclone kit, or an assembled Level IV GEK, or a full Tower of Total Thermal Integration solution. Or, just a GCU. Well, it can be the new “Biochar Experimenter’s Kit” […]
continue reading…
Hi everyone, It’s been another exciting, breakthrough week at All Power Labs and we wanted to make sure you’ve heard the latest:
1-APL unveils new, low cost “BEK” or Biochar Experimenter’s Kit” at International Biochar Conference in Boulder, CO. Jim Mason and Jay Hasty are in Boulder, showing off the TOTTI architecture, and more importantly unveiling APL’s new, low cost design for a Biochar Experimenters Kit, aka the BEK, naturally.
The BEK is completely compatible with the standard GEK cowling. It supports multiple pyrolysis modes in direct combustion, indirectly heated retorts, and hot gas recycle through bed architectures. Temperature, residence […]
continue reading…
|
Recent News Blog Posts
-
End of Year Update
December 21, 2022
-
APL Powers the Verge Microgrid, Again
October 7, 2022
-
APL Summer Open House- Chartainer – 50 kW CHP Demo, Biochar available
September 8, 2022
-
Co-composting Manure with Biochar to Meet Global Methane Goals
August 10, 2022
-
APL Wins Another SBIR Grant
September 10, 2021
-
“Carbon Sequestration with Benefits”: Holiday Party and Open House
December 12, 2019
-
The 40-30-20 sales event
November 21, 2019
-
A Perspective on Terra Preta and Biochar
September 2, 2019
-
Biochar and Bioenergy 2019, Fort Collins CO
July 16, 2019
-
Biochar Usage in Dairy Manure Composting
July 13, 2019
-
Leave a Positive Trace: Permaculture Action Day with Burning Man
June 22, 2019
-
Summer Solstice Char-B-Que Open House at Gill Tract
June 21, 2019
|