A Closer Look At The 2011 Power Pallet

The first edition of the 10kW GEK Power Pallet combined our Tower of Total Thermal Integration with a Kohler v-twin engine. In October of 2010 we began production of the second version, which used a Kubota 3-cylinder industrial spark-fired diesel designed specifically for use with a gaseous fuel, and a Meccalte genhead that could be configured to the requirements of the user’s energy network. This engine, when governed electronically, is stunningly smooth and quiet. Here is a feature-by-feature breakdown of the innovations that have been incorporated into the current Power Pallet line: Control Panel Mount The Process Control Unit and……

Next Workshop Weekend: June 17-19. Update on BEK production

*** FATHER’S DAY GASIFY WITH DAD WORKSHOP *** Join us at ALL Power Labs June 17th through 19th for our next Gasification and Biochar Workshop in Berkeley CA. This is Father’s Day weekend so we hope you will consider planning a father-and-son/daughter trip to All Power Labs for our workshop. It has been too long since our last workshop.  Our first quarter 2011 workshop in the Ivory Coast was canceled due to political unrest.   Then we found ourselves too busy building in-house to have one in the spring.  So we’re now giving you lots of notice for our summer workshop.  ……

Translate »